Is WEHT (ABC 25) on NextGen TV?

ABC · channel 25 · Evansville, IN (Evansville market)

No. WEHT broadcasts only the current (ATSC 1.0) signal that every digital TV can receive. There is no NextGen TV filing for it on record with the FCC.

Source: FCC licensing records, checked October 29, 2026.

WEHT at a glance

Channel on your TV
25
Real (RF) broadcast channel
12 · VHF-high
Network
ABC
City of license
Evansville, IN
License type
Full-power
NextGen TV (ATSC 3.0)
No
Old-format (1.0) signal
On its own transmitter
FCC facility ID
24215

Questions about WEHT

Is WEHT broadcasting in ATSC 3.0 (NextGen TV)?

No. WEHT broadcasts only the current (ATSC 1.0) signal that every digital TV can receive. There is no NextGen TV filing for it on record with the FCC.

Will WEHT stop working on my TV?

Not under today's rules. Any full-power or Class A station that switches to NextGen TV must keep an old-format (ATSC 1.0) simulcast on the air, and that requirement has no end date. What could change it: broadcasters have asked the FCC to let full-power stations outside the largest markets end old-format signals in February 2030. The FCC's own October 2025 proposal leaned the other way — letting each station choose when to stop. A final decision is expected by the end of 2026.

Why can't I get channel 25?

Start with a full channel rescan (Settings → Channels → Auto scan) — stations change transmitters and frequencies more often than people expect. WEHT transmits on real (RF) channel 12, which is VHF-high. Many flat and "HD" indoor antennas are built mainly for UHF and do poorly on VHF-high (channels 7–13). If this station drops out while UHF stations come in, try an antenna that lists VHF-high reception, or one with rabbit-ear dipoles extended.

Why channels disappear → · Where the FCC decision stands → · Does my TV have a 3.0 tuner? →

Get the shutoff alert for Evansville

One email when a station near you files a date, and one when the FCC decides. No newsletter, no spam.

Other stations in Evansville

Full Evansville station list and shutoff timeline →