Is WCLF (CTN 22) on NextGen TV?

CTN · channel 22 · Clearwater, FL (Tampa-St. Pete (Sarasota) market)

No. WCLF broadcasts only the current (ATSC 1.0) signal that every digital TV can receive. There is no NextGen TV filing for it on record with the FCC.

Source: FCC licensing records, checked October 29, 2026.

WCLF at a glance

Channel on your TV
22
Real (RF) broadcast channel
21 · UHF
Network
CTN
City of license
Clearwater, FL
License type
Full-power
NextGen TV (ATSC 3.0)
No
Old-format (1.0) signal
On its own transmitter
FCC facility ID
11125

Questions about WCLF

Is WCLF broadcasting in ATSC 3.0 (NextGen TV)?

No. WCLF broadcasts only the current (ATSC 1.0) signal that every digital TV can receive. There is no NextGen TV filing for it on record with the FCC.

Will WCLF stop working on my TV?

Not under today's rules. Any full-power or Class A station that switches to NextGen TV must keep an old-format (ATSC 1.0) simulcast on the air, and that requirement has no end date. What could change it: broadcasters have asked the FCC to let full-power stations in the 55 largest markets end old-format signals in February 2028. The FCC's own October 2025 proposal leaned the other way — letting each station choose when to stop. A final decision is expected by the end of 2026.

Why can't I get channel 22?

Start with a full channel rescan (Settings → Channels → Auto scan) — stations change transmitters and frequencies more often than people expect. WCLF transmits on real (RF) channel 21, which is UHF. UHF (channels 14–36) is what most indoor antennas are designed for. Reception problems on UHF are usually about distance, walls, or line of sight to the tower — try a window facing the transmitter.

Why channels disappear → · Where the FCC decision stands → · Does my TV have a 3.0 tuner? →

Get the shutoff alert for Tampa-St. Pete (Sarasota)

One email when a station near you files a date, and one when the FCC decides. No newsletter, no spam.

Other stations in Tampa-St. Pete (Sarasota)

Full Tampa-St. Pete (Sarasota) station list and shutoff timeline →